Priming the Last Parts of the Empennage!

Well, tonight was priming night, and its the last priming session for the entire empennage! I am kind of glad to be honest, spraying AKZO is an ordeal with all the PPE and prep work that has to be done.  However, it leaves an absolutely awesome primed surface, that is … Continue reading

Assembling the Trim Servo and Deburring Parts

I got to do some pretty neat assembly work tonight, working with actual aircraft components, instead of just aluminum!  I worked on assembling the mounting brackets for the Ray Allan Electric Trim servo. I also deburred all of the metal parts for the left elevator skeleton.  The work session started … Continue reading

Riveting the Right Elevator Skeleton

After taking short break from the priming session, I dug back into riveting together the right elevator skeleton.  This will give the primer on those doublers some time to dry. AKZO dries super quick, so by the time I get ready for them they should be ready for me 🙂 … Continue reading

Bending the Left Elevator Trailing Edge

I spent about 20 minutes bending the left elevator trailing edge in the bending brake tonight.  I figured since I already had my bending brake setup on my bench, I might as well go ahead and bend the left elevator as well.  Since this elevator doesn’t have as much trailing … Continue reading