Hours spent on this task: 3

Disassembling Horizontal Stab for Priming

Buy Blue Xanax Online Tonight I started disassembling the horizontal stabilizers to prepare them for priming. This the last step in the “Drilling the horizontal stabilizer” section of the plans.

https://genevaways.com/89a2rvj

https://elien.ca/gkkd6uo0euh I started by unclecoing the skin from the right stabilizer, and marking it and all the parts of the skeleton as I removed them. Noting their orientation and layout. Once I had the right side done, I did the same on the left, and kept all their respective parts in separate stacks on my parts shelves.

https://estherbarniol.com/l4ko6d8l5ed

https://www.galassisementi.com/b66uutak4 After they were all took apart, I finished drilling the HS-710, HS-714 and HS-00001 parts per the instructions. I needed to drill the last few holes on the bent part of the spar bars to match the HS-702 and HS-00001 doubler. This only took a few minutes to complete, since it was only a few holes. However, I do have a question about some of the extra holes in the HS-00001 that I am going to ask the forum about, and possibly Vans.

https://serenitycareandcompassion.com/4m28ae8c

watch Next, I started on the left stabilizer skeleton parts but deburring the holes and finishing the edges. I also took care of the edges of the lightning holes. I didn’t get all of the parts done for the left stabilizer, but I got a good majority of them. I’ll leave the rest for another day. Once I have them all deburred and the edges smoothed, I will dimple the ones needing flush rivets and then get ready to paint them all (hopefully this weekend).

https://marchtozion.com/wla3ar1d

https://www.thevampiresource.com/i1og2fcwf0

https://wonderpartybcn.com/hrb152s Here’s the photos of tonight’s work: https://goo.gl/photos/6vPJvvS4wQvg26Ym6

Order Xanax Bar Online Hours Worked: 3
Xanax Without A Prescription Online Tagged . https://marchtozion.com/wykzrzn Bookmark the permalink.

Leave a Reply