watch Tonight I started disassembling the horizontal stabilizers to prepare them for priming. This the last step in the “Drilling the horizontal stabilizer” section of the plans.
https://aalamsalon.com/9kjbsx5kp0rhttps://semichaschaver.com/2025/04/03/knkivmwif I started by unclecoing the skin from the right stabilizer, and marking it and all the parts of the skeleton as I removed them. Noting their orientation and layout. Once I had the right side done, I did the same on the left, and kept all their respective parts in separate stacks on my parts shelves.
source sitehttps://etxflooring.com/2025/04/zon44dw After they were all took apart, I finished drilling the HS-710, HS-714 and HS-00001 parts per the instructions. I needed to drill the last few holes on the bent part of the spar bars to match the HS-702 and HS-00001 doubler. This only took a few minutes to complete, since it was only a few holes. However, I do have a question about some of the extra holes in the HS-00001 that I am going to ask the forum about, and possibly Vans.
Purchase Tramadol Online Codsee Next, I started on the left stabilizer skeleton parts but deburring the holes and finishing the edges. I also took care of the edges of the lightning holes. I didn’t get all of the parts done for the left stabilizer, but I got a good majority of them. I’ll leave the rest for another day. Once I have them all deburred and the edges smoothed, I will dimple the ones needing flush rivets and then get ready to paint them all (hopefully this weekend).
https://musicboxcle.com/2025/04/y4wnbrioyjhttps://reggaeportugal.com/r09ftqe87
https://www.anonpr.net/ibzilqwt Here’s the photos of tonight’s work: https://goo.gl/photos/6vPJvvS4wQvg26Ym6 source url Hours Worked: 3