Hours spent on this task: 3.5

Drilling Right Horizontal Stabilizer

go Today I worked on the right horizontal stabilizer. Technically I completed the “Drilling the horizontal stabilizer” section of the plans, save for the riveting.

click

https://reggaeportugal.com/z380i8ozn2 Todays session was pretty much identical to the last one, except I was completing the right side horizontal stabilizer as opposed to the left from the previous session.

source site

go to site In summary, I clecoed the ribs, then match drilled them to form the skeleton. Then I worked on fitting the HS-00005 and HS-00006 ribs into the skeleton and marking, and back drilling them. The tedious part was the measuring and aligning, and then clamping everything to drill.

https://lavozdelascostureras.com/9dg486z

source Once they were good to go, I started back and match drilling the skins to the ribs and spars. That wrapped up the session for the night. To finish out this subsection, I will disassemble both sides so that I can prep them for priming and riveting.

source url

watch Thats going to include: see 1. Deburring all the holes https://townofosceola.com/lxfhlh9je 2. Scotchbrite all the edges see 3. Rounding any corners https://aalamsalon.com/iyotzhg7 4. Scuffing the surfaces go to link 5. Cleaning everything with acetone. enter 6. Spraying Akzo https://faroutpodcast.com/u1edl9ayfoz 7. Dimpling the skins and ribs http://jannaorganic.co.uk/blog/2025/04/03/udd4a8a 8 Riveting everything together.

https://aalamsalon.com/xu3g8mwh

https://etxflooring.com/2025/04/e4vx0klf  

https://kirkmanandjourdain.com/ouevk4w0zqu

https://musicboxcle.com/2025/04/0h09feo Heres the photos from tonights work: https://goo.gl/photos/5XakAzTRj4FCnpic7

https://colvetmiranda.org/9268995tzt Hours Worked: 3.5
http://jannaorganic.co.uk/blog/2025/04/03/2j5b7cks Tagged . https://audiopronews.com/headlines/luq4y0w0 Bookmark the permalink.

Leave a Reply