Hours spent on this task: 3.5

Drilling Right Horizontal Stabilizer

source site Today I worked on the right horizontal stabilizer. Technically I completed the “Drilling the horizontal stabilizer” section of the plans, save for the riveting.

go site

https://heural.com/nosotros/ Todays session was pretty much identical to the last one, except I was completing the right side horizontal stabilizer as opposed to the left from the previous session.

enter

follow url In summary, I clecoed the ribs, then match drilled them to form the skeleton. Then I worked on fitting the HS-00005 and HS-00006 ribs into the skeleton and marking, and back drilling them. The tedious part was the measuring and aligning, and then clamping everything to drill.

Buy Clonazepam Online Without Prescription

Get Online Xanax Prescription Once they were good to go, I started back and match drilling the skins to the ribs and spars. That wrapped up the session for the night. To finish out this subsection, I will disassemble both sides so that I can prep them for priming and riveting.

click here

https://thermocomfort.ca/oshawa/ Thats going to include: https://meiermedicare.com/reviews/ 1. Deburring all the holes 2. Scotchbrite all the edges
3. Rounding any corners
4. Scuffing the surfaces
5. Cleaning everything with acetone.
6. Spraying Akzo
7. Dimpling the skins and ribs
8 Riveting everything together.

Online Alprazolam

source site  

https://mamamarmalade.com/foot-fetish/

Buy Klonopin Heres the photos from tonights work: https://goo.gl/photos/5XakAzTRj4FCnpic7

follow Hours Worked: 3.5
Tagged . Bookmark the permalink.

Leave a Reply