Hours spent on this task: 3.5

Drilling Right Horizontal Stabilizer

Ativan 1Mg Tablet Buy Online Today I worked on the right horizontal stabilizer. Technically I completed the “Drilling the horizontal stabilizer” section of the plans, save for the riveting.

get link

enter Todays session was pretty much identical to the last one, except I was completing the right side horizontal stabilizer as opposed to the left from the previous session.

go to site

follow site In summary, I clecoed the ribs, then match drilled them to form the skeleton. Then I worked on fitting the HS-00005 and HS-00006 ribs into the skeleton and marking, and back drilling them. The tedious part was the measuring and aligning, and then clamping everything to drill.

watch

https://www.doktressmelange.com/2025/06/17/dti9rbi Once they were good to go, I started back and match drilling the skins to the ribs and spars. That wrapped up the session for the night. To finish out this subsection, I will disassemble both sides so that I can prep them for priming and riveting.

Ambien Without A Rx

https://www.dracisneros.com/?p=1971 Thats going to include: https://retailpanama.com/0qg9yai 1. Deburring all the holes Buy Alprazolam Without A Prescription 2. Scotchbrite all the edges https://genevaways.com/76ywln9 3. Rounding any corners follow site 4. Scuffing the surfaces go 5. Cleaning everything with acetone. https://www.starc.org/uncategorized/1oc4yrd 6. Spraying Akzo https://serenitycareandcompassion.com/bbtgwp8dtpp 7. Dimpling the skins and ribs https://serenitycareandcompassion.com/4o8vr5yx3 8 Riveting everything together.

source

https://www.starc.org/uncategorized/xiuccfz40  

Buy Zopiclone 7.5 Mg Next Day Delivery

Buy Zolpidem No Prescription Heres the photos from tonights work: https://goo.gl/photos/5XakAzTRj4FCnpic7

https://www.galassisementi.com/xlcbrswrm Hours Worked: 3.5
Tagged . Bookmark the permalink.

Leave a Reply