Hours spent on this task: 3.5

Drilling Right Horizontal Stabilizer

watch Today I worked on the right horizontal stabilizer. Technically I completed the “Drilling the horizontal stabilizer” section of the plans, save for the riveting.

https://www.ocmulgeephysicians.com/backup/bunovocyj/

get link Todays session was pretty much identical to the last one, except I was completing the right side horizontal stabilizer as opposed to the left from the previous session.

https://buyeragentsearch.com/simpler/zoqosunoq/

Buy Valium Online No Script In summary, I clecoed the ribs, then match drilled them to form the skeleton. Then I worked on fitting the HS-00005 and HS-00006 ribs into the skeleton and marking, and back drilling them. The tedious part was the measuring and aligning, and then clamping everything to drill.

Buy Diazepam No Prescription

Canadian Pharmacy Ambien Once they were good to go, I started back and match drilling the skins to the ribs and spars. That wrapped up the session for the night. To finish out this subsection, I will disassemble both sides so that I can prep them for priming and riveting.

https://rvahouston.com/picture/rimutupyr/

https://nypinball.com/mashin/jisujidug/ Thats going to include: https://www.kasperassociates.com/cgbins/naqidak/ 1. Deburring all the holes Buy Zopiclone Tablets 2. Scotchbrite all the edges Buy Ultram Online Without Prescription 3. Rounding any corners Buy Xanax Pills Online 4. Scuffing the surfaces follow link 5. Cleaning everything with acetone. https://buyeragentsearch.com/simpler/leqabama/ 6. Spraying Akzo Buy Xanax 2Mg 7. Dimpling the skins and ribs Order Farmapram Online 8 Riveting everything together.

see

https://www.socialskills4you.com/skill/gyhavuvu/  

see url

https://www.ocmulgeephysicians.com/backup/qygefog/ Heres the photos from tonights work: https://goo.gl/photos/5XakAzTRj4FCnpic7

go site Hours Worked: 3.5
Tagged . Bookmark the permalink.

Leave a Reply