Hours spent on this task: 2.5

Drilling the Stiffeners to the Elevator

Tramadol Prices Tonight I spent a few hours working on the elevators. I removed the plastic covering from the inside of the skins, and then fitted the stiffeners to the skins. After I had one side fitted, I match drilled all the holes and then removed the stiffeners, making sure to mark their location so I can put them back exactly. Here is what the right skin looks like: follow site

Buy Xanax Online Overnight Delivery

https://thermocomfort.ca/testimonials/

click

https://thermocomfort.ca/about-us-home-insulation/ I worked through the right elevator skin, and then worked on the left skin, which has the cut-outs for the elevator trim and the trim servo. Additionally, the plans ask us to also fit and match drill the E-615PP plate for the elevator trim opening the the left elevator skin. There are a few holes on this plate that needs to be match drilled, so I completed that portion and will add it to my stack of parts to be primed.

Online Pharmacy Tramadol

https://www.alyssasmusic.ca/about-alyssa/

https://www.pennyroyalhealth.com/contact-us/

follow url

https://www.autenticmed.com.br/landing-page/

enter site Next up will be to deburr all the holes and get them ready for priming. Thats a job for another session!

Buy Ambien 10 Mg

Clonazepam 2Mg Buy Online Here is a link to the google Photos album: https://goo.gl/photos/UuNx1PH8UqWDLNzT7

go site Hours Worked: 2.5
Tagged , , . Bookmark the permalink.

Leave a Reply