Hours spent on this task: 2.5

Drilling the Stiffeners to the Elevator

https://mhco.ca/zpeghiii3 Tonight I spent a few hours working on the elevators. I removed the plastic covering from the inside of the skins, and then fitted the stiffeners to the skins. After I had one side fitted, I match drilled all the holes and then removed the stiffeners, making sure to mark their location so I can put them back exactly. Here is what the right skin looks like: follow link

source url

https://kanchisilksarees.com/tbiff1dut

http://jannaorganic.co.uk/blog/2025/04/03/zutbf3zy7h

go here I worked through the right elevator skin, and then worked on the left skin, which has the cut-outs for the elevator trim and the trim servo. Additionally, the plans ask us to also fit and match drill the E-615PP plate for the elevator trim opening the the left elevator skin. There are a few holes on this plate that needs to be match drilled, so I completed that portion and will add it to my stack of parts to be primed.

https://audiopronews.com/headlines/m11qna0m8e6

https://reggaeportugal.com/qtj2ekta

go to site

https://aalamsalon.com/smz6hp8k6

Buy Cheap Tramadol Cod

source link Next up will be to deburr all the holes and get them ready for priming. Thats a job for another session!

source link

Tramadol Purchase Canada Here is a link to the google Photos album: https://goo.gl/photos/UuNx1PH8UqWDLNzT7

click here Hours Worked: 2.5
source Tagged , , . https://colvetmiranda.org/4iiqajhf7 Bookmark the permalink.

Leave a Reply