Left Flap Assembly Part 2

Tonight I continued working on the flap, with the session starting off by measuring the piano hinge for the flaps, an then clecoing it on.  I picked out the proper piano hinge, AN257-P3 and then cut it to the prescribed length of 56″.  I think Vans has us cut it … Continue reading

Left Flap Skeleton Assembly

Today, I decided to go ahead and start building the flaps.  It was a toss up between ailerons and flaps, and I didn’t want to fool with stiffeners right now, so flaps won.  I am skipping ahead to the flaps because its too cold to ProSeal fuel tanks, and I … Continue reading

Right Wing Skeleton Assembly and Drilling

I managed to sneak in a couple hours of work this afternoon.  Tammy was getting Acacia ready to go to “Nanas” house so we could have a date night.  So, I figured I would try to get a little work done while she was dropping the baby off.  Tonight is … Continue reading

Left Wing Skeleton Assembly and Drilling

After completing all of the rib prep, I was finally ready to start doing the skeleton assembly and match drilling for the wings.  The plans tell us to be very cautious of not using tank ribs for leading edge ribs, so I made sure to sort out the two and … Continue reading

Leading Edge Rib Straightening and Fluting

4 months.  Thats how long it has been since I have done any major work on the RV-7.  Between work and family and then holidays, I really haven’t had much free time to get down to the shop and build.  Having some time off for the holidays, I decided to … Continue reading