watch Time to drill the tank attach Z-brackets. I swung by Ace and picked up some cheap 10-32 bolts, nuts and washers to temporarily hold the brackets to the spar for back drilling. These will get tossed for the final assembly, they’re just used to help steady the bracket for precise drilling. I actually had my little helper Acacia tonight for a little while. We stuck a bolt, and washer in each bracket and then put them on the spars.
Ativan 2Mg Buy Online https://www.starc.org/uncategorized/a9p0s6mcBuy Ambien Pills Then I squared up the brackets to the spare to make sure they were perfectly aligned. My little helper gave up and got bored so she went back upstairs to play with her dolls. But I managed fine on my own. HAH. I used the cheap nuts and bolts in the center hole to tightly hold the bracket to the spar so they wouldn’t move when I was back drilling them form the other side of the spar.
follow url
https://www.starc.org/uncategorized/v75f94yl
go to site I used a small square to make sure the brackets were lined up perfectly perpendicular with the spar.
https://www.starc.org/uncategorized/2ku3tnz2js
https://marchtozion.com/zf30cgi3d
see Once I had all of the brackets installed and squared, I tightened the bolts down and then double checked them with my square to be sure they didn’t move. I did the same to both spars. Next up was to back drill the other two holes in the brackets by using the pre-punched holes in the spars as a guide. Unfortunately, I didn’t snap a pic of the back drilling process, nor the final results. I’ll get a photo of them in the next build log.
follow url
https://genevaways.com/gxllb5u1zr
Buy Xanax Without Prescription I wanted to make sure I had things correct before moving on to the next step, so I slipped the baffle onto the right tank skin and then placed the assembly onto the wing so I could check that the prepunched holes in the baffler were lining up with the centers of my tank attach brackets. Heres the baffle installed on the skin, in my jig.
https://retailpanama.com/tuilf7fsv45 Order Tramadol 100Mg OnlineGreen Xanax Online And here’s the assembly cleco’d onto the wing. The alignment was really good, and the prepunched holes were lining up nicely on the center of the tank attach brackets. Its starting to look like a real wing now! Now, you can see the bulging in the skin where the fuel filler is. That is because I do not have the internal ribs installed. This was merely a test fit to see if the baffles lined up on the center of the tank attack brackets. The tanks will come off before I do any more drilling 🙂
Buy 10Mg Valium Online https://mcleanit.ca/contact/https://www.thevampiresource.com/x20q31jhiz9 I was pretty happy with the results so far, and decided to call it a night. I’ll take the tank assembly off in the next build log, remove the attach brackets and drill their nut plate holes. Once I have all the nut plate holes drilled, I will probably prime them, and then install them onto the spar for the next steps.
go herefollow site Heres the Google Photos album: https://photos.app.goo.gl/8tAeECZ8mQ5VSsi36
https://www.doktressmelange.com/2025/06/17/ro258wzc07https://junkcarboys.com/contact-us And heres all the photos from the build session:
Purchase Diazepamhttps://estherbarniol.com/41acjvwbw Total Time spent: 2.75 hours
https://www.galassisementi.com/m71o7e2bbrbBuy Ativan 2Mg Anyway, you might want to read more about Water quality testing. For you to gain additional knowledge about it.