Hours spent on this task: 3

Vertical Stabilizer metal prep

Buy Lorazepam Online Without Prescription Tonight I mainly focused on metal prep on the vertical stabilizer. I disassembled the stab, and then deburred all the holes. Then I marked which holes on the VS-808PP doubler and VS-803PP rear spar that needed to be countersunk / dimpled. I used my DRDT-2 dimpler to set the dimples in the VS-803PP, and then used a micro-stop countersink cage to machine countersink the holes for in the spar doubler. After a few test fits to make sure those two parts fit flush with each other, I moved on. It came out pretty good:

Buy Clonazepam Online Overnight

Purchase Valium Online

https://www.completerehabsolutions.com/cognitive-screening-assessments/

https://geneticsandfertility.com/patients/ I then removed some strips from the rivet lines on the skins so I could deburr the skin, as well as removing all the remaining plastic from the other parts. I also finished the edges of all the lightening holes in the ribs and doublers. Tomorrow I will work on finishing the edges of all the pieces and then dimpling the skeleton, then it will be ready for cleaning and priming this weekend.

go here

Order Soma 350Mg Online

go to site

go to site Not a lot of photos, since there really wasn’t much to take photos of, but here’s the photos from tonight work: https://goo.gl/photos/Ah54BATLQMPghYVg7

https://drbatayneh.com/cataract/ Hours Worked: 3
Tagged . Bookmark the permalink.

Leave a Reply