Riveting the Left Elevator Skin

https://www.psychiccowgirl.com/uqdt88u Tonight I worked to rivet on the skin of the Left Elevator and the last few remaining parts of the skeleton for it as well.  In the last work session, I completed the spar and a few other parts, but tuckered out before I got to the skin.  I started … Continue reading https://mhco.ca/6f5ovxrnnzj

click here

Closing and Finishing the Vertical Stabilizer

Cheap Clonazepam Purchase After completing the horizontal stabilizer in a previous work session, I decided to continue on and finish the vertical stabilizer.  The Tech Counselor came out this morning and approved all my work so far, and that means its safe to close these guys up and mark them as done!  I … Continue reading http://jannaorganic.co.uk/blog/2025/04/03/ass6fpvi5c

enter

Closing and Finishing the Horizontal Stabilizer

Tramadol India Online Since I have had my horizontal stabilizer inspected and approved, I am ready to close it up and finish it! I started tonights session by re-clecoing the front spar onto the horizontal stabilizer.  I had removed it so the inspector could get a good look inside and check my work. … Continue reading

https://faroutpodcast.com/bgbp3odgw

Riveting the Left Elevator

https://www.anonpr.net/s29u1qews The primer has dried and cured on my left elevator parts, so theres only one thing left to do… Start assembly and riveting! I started out the session by bending the tabs on the elevator skin.  On this left skin, there are two tiny little tabs that must be folded … Continue reading

https://www.annarosamattei.com/?p=lqggoafno70

Priming the Last Parts of the Empennage!

https://reggaeportugal.com/9ec4mt4a8s3 Well, tonight was priming night, and its the last priming session for the entire empennage! I am kind of glad to be honest, spraying AKZO is an ordeal with all the PPE and prep work that has to be done.  However, it leaves an absolutely awesome primed surface, that is … Continue reading

Tramadol Paypal

Building the Trim Tab

https://www.masiesdelpenedes.com/3ta4vr9ly I started this session by first dressing the edges of the left elevator skeleton parts, but that only took about 30 minutes, so I decided to find something else to work on.  Since those parts are waiting on priming, the only thing I have left to start on is the … Continue reading

click here

Assembling the Trim Servo and Deburring Parts

https://mhco.ca/vldeo8p I got to do some pretty neat assembly work tonight, working with actual aircraft components, instead of just aluminum!  I worked on assembling the mounting brackets for the Ray Allan Electric Trim servo. I also deburred all of the metal parts for the left elevator skeleton.  The work session started … Continue reading

Purchase Tramadol Online Cheap

Preparing the Left Elevator

https://semichaschaver.com/2025/04/03/5132xd5 I managed to get a TON of work done tonight, and worked a straight 4 hours on the section of plans titled “Preparing the Left Elevator”.  In a nut shell, I completely build entire left elevator, and have it disassembled so all the parts can be deburred, and the edges … Continue reading

follow

Riveting the Right Elevator

https://musicboxcle.com/2025/04/a47v2jt3 Its time to rivet up a control surface! The right elevator is ready to be closed up and riveted.  I have decided that I am going to rivet the bottom side of the skins, and leave the top side clecod down for now.  This way, I can hold off on … Continue reading

Cheap Clonazepam For Sale