Leak Testing the Left Tank

follow link Another quick update.  The left tank has been curing for about 4 days or so, and its time to do a leak test! I set it up like the right tank, by using a ballon as a presssure rupture vessel and also a pressure containment vessel.  I aired the tank … Continue reading https://lavozdelascostureras.com/wb2e3rcj0e

https://www.annarosamattei.com/?p=uaw1sh8kvi6

Closing Up the Left Tank

https://musicboxcle.com/2025/04/npqhzwerw I managed to get the left tank closed up tonight!  I started out by cleaning the tanks inside really good with MEK and paper towels and made sure all the parts were in the right order and oriented.  Then I cleaned the baffle really good with MEK, as the tank … Continue reading https://www.villageofhudsonfalls.com/ky0xt00

https://kirkmanandjourdain.com/pxnbw83szq

Sealing the Left Tank Access Cover

source site Another quick build session.  I first wanted to do a initial water leak test, but that proved to be a bad idea.  Well, using the cork gasket as a temporary seal instead of sealant on the access plate proved to be a bad idea.  I filled the tank up with … Continue reading

follow

Left Tank Closing Prep Work

https://lavozdelascostureras.com/uy56tlitgxx Just a quick prep work session tonight.  I had a few things to get done before I do the water leak test.  The time lapse didn’t catch much due to the angle, but here it is anyways. I started off by pulling the masking tape off the fittings, and then … Continue reading

go here

Riveting Left Tank Inboard Outer Rib

https://etxflooring.com/2025/04/k6ra5b02ktg LOTS of work done in this session!  I had to capture it in two time lapse videos, Here is the first video: The second covers the last bits, found below.  I started the session by dry fitting the outer rib and then trimming the last little bits of excess on … Continue reading

https://www.anonpr.net/qkis5zo7

Left Tank Miscellaneous Sealing Work

https://reggaeportugal.com/rtzod90rh9o Good progress tonight! I wrapped up a few miscellaneous things that needed to be done before riveting the inboard outer rib. Here is the time lapse: The first thing I did was to test fit all the accessories and fittings on the inner rib to make sure I had everything … Continue reading

watch

Riveting and Sealing Outboard Rib Left Tank

get link The goal for tonight was to get the outboard rib sealed and riveted.  I started out with a bit of miscellaneous work first though. I did capture another time lapse, and heres that video: I fixed up the fuel return line, and cut it to the right length, and then … Continue reading

https://www.psychiccowgirl.com/pg3u48t84

Riveting the Left Tank Ribs – Part 2

click here Got a lot done tonight! I finished up the larger riveting job on these inner ribs.  I had three left from the last session, so I finished those last three up tonight. Heres the timelapse: My tools were already ready to go from the last session, so I jumped right … Continue reading

https://www.anonpr.net/kqqfgaq1

Riveting the Left Tank Ribs – Part 1

https://www.masiesdelpenedes.com/b9jci03wt2 This is a simple update.  I got two of the inner ribs riveted in place in this short session.  I am coming up on the end of a 48 hour fast, and was a bit tuckered out, but wanted to get a little work done, so I decided to get … Continue reading

Buy Klonopin Generic

Sealing the Left Tank Inner Ribs

here After a short break from the previous build session today, I came back down to get the inner ribs sealed and cleco’ed in the left tank.  This will set me pretty good to do some riveting on them tomorrow and Monday.  I would love to have this left tank ready … Continue reading

https://www.villageofhudsonfalls.com/mbl93mw5ld9