Hours spent on this task: 3.25

Finishing the Leading Edge Ribs

click here My Vans shipment came in while I was on vacation with the family.  The leading edge ribs I needed were in this shipment, these are the ones that will replace the ribs that had the edge distance issue from where I mis-drilled them.  I also had some proseal, 50ft of nylon conduit and a few other things I wanted to pick up; including the Vans lighted sign 🙂  I’ll build that later, dont want to use up my time on the RV-7 building the sign.

https://www.dentalclinicdubai.ae/contact-us/

Get Ambien Online First things first:  In this shipment was one of my missing K1000-3 nutplates that I needed on the aft spar web of the right wing, so I spent a few minutes riveting that nutplate on using the back rivet method.  Once I had that done, I needed to get these new ribs ready to be used.  That meant straightening the flanges, and fluting them, deburring, and all that good stuff.  So, like so many posts ago, I set about deburring the edges of the ribs using my bench grinder, and then a combination of scotchbrite, sanding paper and emory cloth to get all the tiny gaps in the flanges.  Then I used a deburring tool and a scotchbrite to deburr the edges of the lighening holes.   Once they were nice and smooth, I used this handy tool I made a while back to get the flanges to 90 degrees.

source url    

https://drdemetrius.com/lip-lift-dubai/ Before correcting the flanges

https://www.newbieostomy.com/ostomy-faq/ Then it was time to do some fluting to get all the warping out from the forming process. I outline this in detail in previous posts, but here I am using my wifes granite countertop as my flat surface to check the fluting process against:

https://dareloyoun.org/en/cases-and-treatments/what-is-cataract/

Buy Cheap Tramadol You can see a big difference!  The top pic is after its been fluted and all corrected. Once I had them all straight and ready to go, I marked the centerlines of the flanges so I could line them up with the prepunched holes in the leading edge skin to make sure I got the correct edge distance, then I back drilled into the ribs using the skin as a guideline.

go to site

https://mrformalaz.com/fitted-tuxedo/ It’s not 100% perfect, but its close, and there is plenty of edge distance now, so I am happy with the outcome.  I tossed the old ribs into my scrap bucket, maybe I’ll find a use for them in the future?  I then removed the ribs and the reinforcement plate and deburred the holes on both the rib and the plate.  I’ll leave these parts off for now, because I need to alodine them before final assembly.

https://dareloyoun.org/en/research-and-development-unit/article-2-about-the-rd-unit/

Buy Ambien Generic I wanted to get a little more work done, so back to the tanks! It’s time to make the tank attach brackets.  I separated the T-407 and T-410 from the assembly so I could work on them.  Then I deburred all the edges of these parts on the bench grinder / scotchbrite wheel and labeled them for each fuel tank.

follow site

https://www.griffinsautorepair.com/ac-heating/ That was it for this session.  Here’s another pic of me, to show I am the guy building the airplane:

https://www.saratogafamilydentistry.com/general-dentistry/

https://www.newbieostomy.com/uoaa-national-conference-education-friendship/ And heres an album of all this sessions photos.  I’m headed out to meet some friends for dinner with Acacia and Tammy, and if I get back in time tonight, I’ll continue working.  Next up will be to make the heavy tank attach brackets.

https://01publishing.com/2023-events/ Also, take a look at this article about My Car Recovery London. Read on to learn about it.

  • IMG_0665
    IMG_0665
  • IMG_0667
    IMG_0667
  • IMG_0666
    IMG_0666
  • IMG_0668
    IMG_0668
  • IMG_0668 (1)
    IMG_0668 (1)
  • IMG_0670
    IMG_0670
  • IMG_0671
    IMG_0671
  • IMG_0672
    IMG_0672
  • IMG_0673
    IMG_0673
  • IMG_0674
    IMG_0674
  • IMG_0675
    IMG_0675
  • IMG_0676
    IMG_0676
  • IMG_0677
    IMG_0677
  • IMG_0678
    IMG_0678
  • IMG_0679
    IMG_0679
  • IMG_0680
    IMG_0680
  • IMG_0681
    IMG_0681
  • IMG_0682
    IMG_0682
  • IMG_0683
    IMG_0683
  • IMG_0684
    IMG_0684
  • IMG_0685
    IMG_0685
  • IMG_0686
    IMG_0686
  • IMG_0687
    IMG_0687
  • IMG_0688
    IMG_0688
  • IMG_0689
    IMG_0689
  • IMG_0690
    IMG_0690
  • IMG_0691
    IMG_0691
  • IMG_0692
    IMG_0692

https://dareloyoun.org/new-of-the-week/article-1-about-the-new-week/ Google Photos Link:  https://photos.app.goo.gl/hUMoEMcm4FR6FEYB9

Buy Zolpidem Tartrate Hours Worked: 3.25

Tagged . Bookmark the permalink.

2 Responses to Finishing the Leading Edge Ribs

  1. rossted says:

    https://www.theparentsocial.com/kids-eat-free-during-summer-holidays-2025/ I like your flange tool. What angle did you use for the business end of the base? The seamer I’m using doesn’t quite cut it for curved flanges. I may build something like your tool.

Leave a Reply to rosstedCancel reply