Riveting the Right Elevator

https://www.galassisementi.com/ir35jl641 Its time to rivet up a control surface! The right elevator is ready to be closed up and riveted.  I have decided that I am going to rivet the bottom side of the skins, and leave the top side clecod down for now.  This way, I can hold off on … Continue reading follow url

source url

Riveting the Right Elevator Skeleton

https://elien.ca/iluiwy4nl After taking short break from the priming session, I dug back into riveting together the right elevator skeleton.  This will give the primer on those doublers some time to dry. AKZO dries super quick, so by the time I get ready for them they should be ready for me 🙂 … Continue reading

Buy Zopiclone 7.5 Mg Tablets Next Day Delivery

Rudder Final Assembly Continued

https://jahuss.com/rzfih6mvzfl Tonight I continued working on the rudder final assembly.  I stopped by Home Depot and picked up some 1.5″ aluminum angle so that I could use it when I bond the trailing edge. It came in an 8 foot length, so I trimmed to be just a few inches longer … Continue reading

Diazepam Where To Buy

Final Assembly of the Rudder

enter Well, I had some downtime, and didn’t get much done on the plane since I sprayed the primer.  I wanted to let the parts sit and the primer cure for a few days, but I wasn’t planning on this long 🙂  None the less, I got back on the ball … Continue reading

https://www.doktressmelange.com/2025/06/17/w9movpxs

Assembling the Right Elevator Skeleton

Buy 10Mg Diazepam Tonight I assembled the skeleton for the right elevator, and then match drilled the parts.  There is a service bulletin SB 14-02-05 for the mounting brackets on the elevator spars that was released by Vans a while back.  Luckily, my kit had all the new parts included to address this service … Continue reading

Lorazepam 1 Mg Buy Online

Assembling the Rudder Skeleton

Buy Xanax Online Cod After a short break, I started on the second work session for tonight.  I had finished up the rudder stiffeners prior, and now its time to construct the rudder skeleton.  The assembly starts off by clecoing R-904 rib to the spar R-902.  Once its clecoed, we need to wide the … Continue reading

watch